OVERVIEW

The Mechanical Backbone HCAI project at Chinese Hospital replaces aging rooftop mechanical equipment and provides new duct risers serving six stories of the 1979 hospital building.  The project also included reroofing of the entire 1979 building’s roof, including the penthouse. Our design team performed a full scan, developed a 3D Model and designed a complete solution for the AHU pictured below. Below, you can see the final product, along with the BIM Model and the model overlayed with our scan. Leveraging this robust model, we worked with the talented team of Mar Con Builders, Anco Iron & Construction INC and Sheedy Drayage Co. to get the AHU installed.

SCOPE
  • Safe off, cut, cap and drop for first floor through Roof.
  • Demolition and removal of existing AHU-2 and RF-1 after completion of first and second phase work
  • Installed bypass ducts and duct re-routes and new HVAC ducts with Insulation for all floors
  • Installed Mason BR Mounts for New Ducts in New Shaft
  • Installed new rooftop AHU-5 and new rooftop EF-15
  • Pre and Post Air balance with adjustments to be made throughout Phases
  • Installed (23) FSD's
  • Provided Weekend Crane Picks with permits